Site visit within 24–48 hours in Delhi NCRHow it works

DLF Cyber City · Office Glass Partitions

Glass Office Partitions in DLF Cyber City, Gurgaon

Glass office partitions in a DLF Cyber City tower are frameless or aluminium-framed cabins built to the floor's curtain wall, ceiling grid and fire system. A frameless cabin with door starts at ₹400 per sq ft; where the lease is short, an aluminium-framed cabin is easier to take down at exit.

Updated DLF Cyber City, Gurgaon

Frameless glass office cabin with a 12mm toughened glass door on a carpeted leased office floor

Glass office partitions in DLF Cyber City are built inside some of the most tightly run floor plates in Gurgaon. Gateway Tower, DLF Square, Infinity Tower, DLF Atria and the numbered buildings share one pattern: a deep, column-free floor wrapped in a glazed curtain wall, a suspended ceiling hiding sprinklers and ducts, and carpet tiles or a raised floor underfoot. A cabin here is less about the glass than about where it meets each of those surfaces. Our DLF Cyber City area page covers permits and lift slots; this page is about the partition itself.

Where a cabin meets the building

  • The curtain wall. A partition that runs to the facade has to land on a mullion, not on the window glass. The spacing of those mullions decides where cabin walls can sit, so plan the layout on the grid.
  • The ceiling. Stopping at the false ceiling is quicker; running to the slab above stops sound from travelling over the top. A sprinkler or smoke detector close to the line has to be cleared with the building's engineers.
  • The floor. Carpet tiles are usually cut back so the bottom channel or patch fitting sits on the screed. On a raised floor, the fixing has to reach through to something solid.

Choosing a cabin for a leased Cyber City floor

Glass partition styles for a DLF Cyber City office, with starting rates
StyleWhy it suits a Cyber City floorFrom
Frameless glass office partition with doorClean sightlines across a daylit floor; the look most corporate fit-outs want₹400 per sq ft
Aluminium profile office partition with doorThe frame takes up uneven slab edges and can be dismantled and reused when the lease ends₹1,100 per sq ft
Frameless fixed glass office partitionCorridor walls, reception screens and focus rooms where nobody needs a door₹350 per sq ft

All three use 12mm Saint-Gobain toughened glass with SS304 fittings, and the floor machine on a door carries a 2 year functional warranty. The lease matters more than taste. Many tenants have to hand the floor back as they found it, and a frameless cabin is made for one opening only, because toughened glass cannot be cut once tempered. A framed system can more often be moved.

Meeting rooms that keep a conversation private

The most common complaint about glass meeting rooms in big towers is not the look. It is that voices carry. Three details help: take the glass to the true ceiling or close the gap above it, specify a door with a proper seal at the floor, and keep air-conditioning returns from linking two rooms. A frosted band or a full frosted glass panel deals with visual privacy. Our guide to office glass partition sound and privacy goes further.

What to check before you book

  1. Ask the facility team for the floor's fit-out manual and any approved partition details.
  2. Find out whether the lease requires reinstatement at exit.
  3. Mark where meeting rooms need full-height glass and where a ceiling stop will do.
  4. Note the sprinkler and detector positions on the reflected ceiling plan, if you have one.

The ₹99 site visit then measures the openings, the service lift and the ceiling. We usually visit within 24 to 48 hours, the written quote is aimed within about 2 hours and holds for 3 days, and production starts on a 50% advance. Toughened glass generally takes 7 to 10 days, which is often how long the building's approval takes anyway.

A partition that buzzes when the AC starts usually has loose fixings; see glass partition rattling. For costs across Gurugram, read the office glass partition cost guide or browse all office glass partition styles. Office glass partitions in Gurgaon covers the wider city, and the restaurants next door are on our Cyber Hub page. Book a visit once the layout is pencilled in.

Common questions

Should a glass meeting room in Cyber City go up to the slab or stop at the false ceiling?

For a room where conversations must stay private, take the glass or a sealed bulkhead to the slab, because sound travels easily through a false ceiling. For an open cabin or a breakout area, stopping at the ceiling is quicker and cheaper. Sprinklers and ducts above the grid decide what is possible, so it is checked at the site visit.

Can glass cabins be removed when our lease ends?

Aluminium-framed cabins usually come down and can often be reused or adapted. Frameless toughened glass can be removed too, but each panel was made for its opening and cannot be cut down, so reuse elsewhere is limited. If your lease requires reinstatement, mention it when you book.

Cyber City office mein cabin banwane mein kitne din lagte hain?

The glass generally takes 7 to 10 days to produce after the 50% advance, and installation itself is usually quick. In a managed tower, the building's fit-out approval often takes about as long, so start it the day you approve the written quote and the two finish together.

What is the cheapest glass partition for a Cyber City office?

A frameless fixed glass partition with no door, from ₹350 per sq ft. It suits reception screens and corridor walls. Adding a door brings in a floor machine and handle, so a frameless cabin with door starts at ₹400 per sq ft, and an aluminium-framed cabin at ₹1,100 per sq ft.

Site visit ₹199₹99Adjusted in the final bill

Book site visit

515 site visits requested

Support