Site visit within 24–48 hours in Delhi NCRHow it works

Sector 94 · Glass Office Partitions

Glass Office Partitions in Sector 94, Noida

Offices fitting out a floor in Sector 94, Noida, such as in BPTP Capital City, can have frameless glass cabins from ₹400 per sq ft and fixed glass walls from ₹350 per sq ft. The glass is measured once the ceiling grid and floor are in, and made in about 7–10 days.

Updated Sector 94, Noida

Frameless 12mm toughened glass office cabin with a glass door on a corporate office floor

Sector 94's office space is concentrated in a few big buildings by the Expressway's start, the largest being BPTP Capital City, where MediaTek took about 104,000 sq ft across three floors in 2026 and Table Space runs a managed office on the 15th floor. Tenants on floors like these usually get a shell and build their own layout. Glass partitions are one trade among many in that fit-out, and the order in which trades arrive decides how well the glass ends up fitting.

Where does glass fit in the fit-out sequence?

  1. Layout frozen. Cabin and meeting room lines are marked on the floor plan, with door swings shown.
  2. Services above the ceiling. Ducts, sprinkler pipes and cable trays go in. Partition heads must avoid sprinkler heads and supply grilles.
  3. Ceiling grid and floor finish. Glass is measured to the finished floor and the finished ceiling, never to the bare slab.
  4. Measurement and fabrication. Toughened glass is produced to size, which generally takes 7–10 days.
  5. Installation, then furniture. Glass goes in before desks and chairs crowd the floor.

Which style for which room?

Partition styles for Sector 94 office floors
RoomStyleFrom (per sq ft)
Leadership cabinFrameless glass cabin with door₹400
Lab or project area dividerFixed frameless glass wall₹350
Boardroom with a framed lookAluminium-framed cabin with door₹1,100

A 10 ft by 12 ft cabin with two glass sides at 9 ft high is roughly 200 sq ft of glass, about ₹80,000 as a frameless cabin before the quotation adjusts for the measured area and door. The frameless styles are 12mm Saint-Gobain toughened glass on SS304 fittings, with a 2 year functional warranty on the floor machine. The aluminium-framed cabin is the dearer option here because its black frame is added around the same glass for the look. Office glass partition cost breaks the numbers down further.

Door hardware for busy cabins

A glass door in a frameless cabin hangs on a floor spring set into the floor, with patch fittings top and bottom. On a raised access floor, the spring needs a solid base under the tile, which is worth raising with the landlord before the floor goes down. Doors to meeting rooms that open hundreds of times a day are where hardware wears first; floor spring or door closer compares the two systems.

Building rules that shape the schedule

  • Large office towers commonly limit drilling and noisy work to after hours or weekends; ask facility management for the permitted slots.
  • Every pane is made to size and travels up in the service lift, so the lift car's dimensions set the largest panel.
  • Expect to submit partition drawings and a worker list before access is granted.

Privacy without losing the light

Research and HR rooms often need eye-level privacy. A frosted band in film is quick and reversible when a tenant's needs change; frosted glass is permanent. For meeting rooms, sealing the head, floor and door edges matters more for sound than glass thickness alone, as sound privacy in glass partitions explains.

The ₹99 visit is generally arranged within 24–48 hours and is adjusted against the bill. A free, all-inclusive quotation follows within about 2 hours, valid for 3 days; fabrication starts on a 50% advance and the balance is due on completion. See the Sector 94 page for the wider sector, glass office partitions in Noida for every style and offices in Noida for whole-office planning.

Common questions

When should glass partitions be measured in a new Sector 94 office?

After the ceiling grid and floor finish are installed, so the glass is made to the finished heights. Book the site visit at that stage; it is generally arranged within 24–48 hours, and toughened glass then takes about 7–10 days to produce.

Can partition work in BPTP Capital City be done at night?

Work is timed to the building's rules, and many office towers only allow noisy work at set hours. Share the permitted slots at booking and the installation is planned around them.

What warranty comes with a frameless glass cabin?

Warranty is on fittings, not the glass. The frameless office styles carry a 2 year functional warranty on the floor machine.

Can you work to our interior designer's drawings?

Yes. Office glass work is customised to the space and layout. Share the drawings before the site visit, and the team checks them against the actual floor while measuring.

Site visit ₹199₹99Adjusted in the final bill