Site visit within 24–48 hours in Delhi NCRHow it works

Pitampura & Rohini · Office Glass Partitions

Office Glass Partitions for Netaji Subhash Place Tenants

Most office glass work in Pitampura is a tenant fit-out in a Netaji Subhash Place tower: cabins and a meeting room planned around the building's fit-out rules and a booked lift. A frameless partition with door starts at ₹400 per sq ft; fixed panels from ₹350 per sq ft.

Updated Pitampura & Rohini, Delhi

Glass-walled office cabin and meeting room on a commercial tower floor

Netaji Subhash Place, at the southern end of Pitampura by the Red and Pink Line interchange, is North-West Delhi's main office district. Its towers are let floor by floor or suite by suite, and tenants change often, so office glass partitions here are mostly about a new tenant moving in on a deadline. Our Pitampura and Rohini area page introduces the area. This page walks through a tenant fit-out from the glass side.

Before you plan: what the building will ask for

Most managed office buildings have fit-out rules, and NSP towers are no exception. Expect some or all of these:

  • A layout drawing submitted to the building management before work starts.
  • Noisy work, such as drilling into the floor for a floor spring, restricted to evenings or Sundays.
  • A booked service lift slot for bringing glass up, and protection on lift walls.
  • A named list of workers for the security desk.

Collect these rules before the site visit, so the quote and schedule fit them from the start.

Layouts that suit small NSP suites

Office glass styles for Netaji Subhash Place
StyleWhy it suits an NSP suiteRate from
Frameless partition with doorCabins along the window wall that still pass light to the open floor₹400/sq ft
Frameless fixed partitionGlass walls between the meeting room and the corridor, with one door section₹350/sq ft
Aluminium profile partition with doorTraining rooms and server rooms that need solid lower panels or better sealing₹1,100/sq ft

Use our glass partition cost calculator for a first estimate before the visit. The office glass partition cost guide explains what the rate covers.

Privacy and sound

A meeting room next to an open floor of sales staff needs two things: speech kept in, and eyes kept out. Glass taken up to the slab and a door that seals deal with the first; frosted glass or film at seated eye level handles the second. The office glass partition sound and privacy guide goes further.

Taking over a floor with glass already in it

Outgoing tenants often leave their partitions. Keeping them can save money, but only if they fit your layout, because toughened glass cannot be cut down. Hardware like floor springs and patch fittings can often be reused if they are in good order. Frosted film left behind may be peeling; frosted film peeling explains the fix. A door that slams because its floor spring has lost adjustment is covered in glass door closing too fast.

Timeline for a tenant fit-out

  1. Book a ₹99 site visit, usually within 24 to 48 hours.
  2. Receive a written, all-inclusive quote, aimed within about 2 hours of the visit and valid for 3 days.
  3. Pay the 50% advance; 12mm Saint-Gobain toughened glass is produced in generally 7 to 10 days.
  4. Install in the building's permitted hours, then pay the balance on completion.

Rohini's district and community centres have smaller offices, clinics and coaching rooms with the same options. Browse the office glass partitions catalogue, see office glass partitions across Delhi, or look at nearby Model Town. Book the visit once you have the building's fit-out rules in hand.

Common questions

How much does an office cabin cost in Netaji Subhash Place?

Office glass is priced per sq ft: a frameless partition with door from ₹400 per sq ft, fixed panels from ₹350 per sq ft. The total depends on the wall area, doors and frosting. The written quote after the site visit is all-inclusive and valid for 3 days.

Can partitions be installed on a weekend in NSP?

Often, yes, and many buildings prefer it for noisy work. The building management decides the permitted hours. We schedule installation once the glass is ready, generally 7 to 10 days after the advance, and fit around the building's rules and lift booking.

Purane tenant ka glass reuse ho sakta hai?

Sometimes. If the existing panels fit your new layout exactly, they can stay. Toughened glass cannot be cut, so panels that do not fit must be replaced. Hardware in good condition can often be reused. We assess both at the visit.

Site visit ₹199₹99Adjusted in the final bill

Book site visit

515 site visits requested

Support