Site visit within 24–48 hours in Delhi NCRHow it works

Sectors 104–110 · Bathroom Glass Partitions

Shower Glass for New Bathrooms in Noida Sectors 104 to 110

New flats in Sectors 104–110 are usually handed over with an open shower area, so glass goes in before you move in: a frameless door from ₹500 per sq ft where its swing clears, a sliding partition where it doesn't. One ₹99 visit measures every bathroom.

Updated Sectors 104–110, Noida

Frameless glass shower partition with a hinged door in a newly tiled apartment bathroom

In Lotus Panache's towers, Lotus 300 and ATS One Hamlet, bathrooms arrive finished: tiles laid, fittings fixed, a floor drain set where the builder decided the shower would be. Glass is the owner's job. Because nothing is being re-tiled, the glass has to work with what the builder built, so it pays to read the bathroom carefully before picking a style.

Read the builder's bathroom first

  • The drain. The glass line sits just outside the drain's catchment, so the drain position largely fixes where the partition goes.
  • The floor fall. If the floor slopes toward the drain only inside the shower zone, a door can sit at the edge of that zone; if it slopes across the whole room, glass helps less.
  • Kerb or flush. Many new bathrooms are flush. A good bottom seal matters more then.
  • Concealed pipes. Ask the builder for the plumbing layout, so fixing holes avoid pipes behind the tiles.

Township flat or premium flat

Shower glass for new flats in Sectors 104–110
StyleWhy it suits a new Sector 104–110 bathroomRate from (per sq ft)
Frameless shower partition with doorStandard township bathrooms where the door swing clears₹500
Frameless sliding shower partitionNarrow bathrooms with the WC close to the shower₹550
Fixed frameless shower partitionSecond or servant bathrooms on a tighter budget₹370
Slim profile shower enclosure with doorPremium master baths in Lotus 300 or ATS One Hamlet₹1,100

A typical 3BHK in a township might take two partitions with doors of about 28 sq ft each, roughly ₹14,000 apiece, plus a fixed screen in the third bathroom. Glass is 10mm Saint-Gobain toughened with SS304 fittings, and bathroom hardware has a 1 year functional warranty. The shower cubicle cost guide explains how size and hardware add up.

Care in the first year

Fresh silicone needs time to cure, so wait before the first shower as advised on installation day. After that, the two things that show up first in new bathrooms are mould in the silicone line where water sits, see black mould in partition silicone, and a bottom seal that wears or shifts, see worn shower seal strip. Both are easy fixes caught early.

Before booking

  • Have the possession letter and the society's fit-out permit ready.
  • Book the service lift; big townships see heavy move-in traffic.
  • Tell your interior designer, so glass goes in after cabinets near the shower.

The ₹99 visit is usually within 24–48 hours and adjusted against the bill. All bathrooms are measured in one go, and a free, all-inclusive written quote follows within about two hours, valid for 3 days. Pay 50% to start and 50% on completion; the toughened glass takes 7–10 days to make. Compare styles on bathroom glass partitions in Noida and in the shower glass catalogue. The Sectors 104–110 page covers the rest of a possession fit-out, and Sector 93 next door has larger master baths.

Common questions

Can you drill into tiles without hitting concealed pipes?

Fixing points are placed away from known pipe runs, which is why the builder's plumbing layout helps. Without it, the mixer and shower positions show where pipes usually run, and holes are kept clear of those lines. We check before drilling.

Naye flat mein shower glass shift hone se pehle lagwayein ya baad mein?

Before, if you can. Empty rooms, no daily showers and a society already expecting fit-out work make installation simpler. The visit can happen right after possession, and the glass is made in 7–10 days after the advance, so plan it into your move-in timeline.

What does shower glass cost for a 3BHK in Lotus Panache?

As a guide, two frameless partitions with doors of about 28 sq ft each come to roughly ₹14,000 apiece, and a fixed screen for the third bathroom starts at ₹370 per sq ft. The written quote after measuring gives the exact all-inclusive total.

Why is there black mould on my shower silicone?

Water sitting on the silicone line, plus poor ventilation, lets mould grow into the sealant. Surface mould can be cleaned; mould inside the silicone needs the joint cut out and resealed. Keep the exhaust running after showers and wipe the bottom edge dry.

Site visit ₹199₹99Adjusted in the final bill

Book site visit

515 site visits requested

Support