Site visit within 24–48 hours in Delhi NCRHow it works

Sector 29 · ACP Cladding, Facades & Shutters

Re-Branding a Restaurant Facade in Sector 29, Gurgaon: ACP, Louvres and Glazing

A Sector 29 restaurant changing hands usually re-does its face: a new ACP fascia in the brand's colours, louvres that hide the kitchen exhaust and AC units, glazing on upper floors that look over Leisure Valley, and a shutter for after closing. All facade work is quoted after a ₹99 visit.

Updated Sector 29, Gurgaon

Aluminium composite panel fascia across the front of a restaurant building

Restaurants in Sector 29 change concept and owner often, and each new brand wants its own face on the block. The building stays the same: a commercial block beside Leisure Valley with a ground-floor frontage, often a first or second floor and a roof used for seating. Re-branding a facade in Sector 29, Gurugram, is therefore usually a re-skin, not a rebuild, and it has to be done in the gap between one restaurant closing and the next opening.

The four layers of a restaurant front

Facade layers for a Sector 29 restaurant re-brand
LayerWork that suits itPrice
Brand fascia and sign bandACP cladding in brand colours, with sign cut-outsQuoted after visit
Kitchen exhaust and AC unitsAluminium louvers screening the servicesQuoted after visit
Upper floor overlooking the parkStructural glazing for an open viewQuoted after visit
Night securityRolling shutter behind or in front of the glassQuoted after visit

ACP fascia: colour, grade and the old frame

Most re-brands start with the fascia. The old ACP is often re-skinned on its existing frame if the frame is sound, which saves time; if the panels have bowed or come loose, the frame is checked and re-fixed first, since a loose ACP panel on a busy street is a hazard. Near kitchens and cooking smoke, specify a fire-retardant core. Brand colours in strong reds and oranges fade fastest in sun, so a good coating matters. The shop front design ideas guide shows how fascia, sign and glass work together.

Louvres over the kitchen

A restaurant front collects exhaust hoods, AC outdoor units and fresh-air intakes. Louvres in the same colour family as the fascia hide them while letting air through. Kitchen exhaust needs a clear path out; louvre blades in front of it must not trap grease-laden air, and the spacing is checked against the exhaust at the visit.

Glazing over Leisure Valley

Upper floors facing the park sell their view. Replacing a solid wall or small windows with structural glazing opens the room to it. The glass is bonded to its frame with structural silicone, and the joints need inspection over time; a structural glazing leak usually traces back to a failed seal. The structural glazing vs ACP guide helps decide where each fits.

Shutters for late closing

A restaurant that closes at 1 am needs a shutter that comes down quietly and locks easily. A shutter that sticks halfway is covered under rolling shutter stuck; on a wide front, a motor is worth it.

Timing the job

The ₹99 visit surveys the elevation, frame and access, and is usually arranged within 24 to 48 hours. The written quote follows within about two hours, valid for 3 days, and work starts after the 50% advance. Facade work at height needs scaffolding or a lift on a busy street, so it is planned for mornings, before traffic and guests arrive.

See the Sector 29 page, facades and shutters in Gurgaon, the facades and shutters catalogue, the ACP cladding price guide and work for restaurants and cafes. Nearby MG Road has similar commercial frontages.

Common questions

Can the old ACP frame be reused for a new restaurant's fascia?

Often, yes. If the frame is straight, firmly fixed and not corroded, new panels in the new brand's colours can go on it, which saves time. If panels have bowed or come loose, the frame is checked and re-fixed first. We inspect it at the visit.

Will louvres in front of the kitchen exhaust cause problems?

Not if they are designed for it. The blades must leave a clear path for exhaust air and must not trap grease. Spacing is set against the exhaust size, and the louvres can be removable for cleaning. We check the exhaust and AC units at the visit.

How long does a facade re-brand take in Sector 29?

It depends on the scope. After the 50% advance, ACP panels and frames are fabricated, then fixed on site, usually in mornings to avoid traffic and guests. The schedule is written into the quotation once the design and colours are agreed.

Upar wali manzil par poora glass lag sakta hai kya?

Often, yes, with structural glazing, if the building owner agrees and the structure allows it. It opens the floor to the Leisure Valley view. The frame and glass are designed after a survey of the elevation, and quoted after the visit.

Site visit ₹199₹99Adjusted in the final bill

Book site visit

515 site visits requested

Support